BidReport

Hundreds of RFPs are posted each week, but only a few fit your profile. Bid Report cuts through the noise.

How it works

  1. 01Define your practice

    Services, project stages, regions and contract sizes, along with any organizations you always want to hear from.

  2. 02Postings are classified

    Each new posting is classified by work, location and contract value, then scored against your profile.

  3. 03Morning briefing

    The strongest matches lead, each with its closing date and a link to the original posting.

  4. 04Browse your dashboard

    Every posting that fits, with its % match, details and files, ready to move into your pipeline.

Your morning briefing

One email each weekday, built from your profile.

7:005G ▮▮▮
B
Bid Reportto me · Tue, Oct 6
Daily Bid Report: October 6 (British Columbia)
Bid Report

Tuesday, October 6

Your daily highlights

TransLink
Battery Electric Bus (BEB) Depot Charging Feasibility Study and Design
Closes Oct 8, 2:00 pm (2 days)
Feasibility study and design for battery electric bus (BEB) depot charging, TransLink (see Ariba Discovery posting)
City of Vancouver
PS20261908-ENG-RFP Consultant for the Granville Bridge South Ramps Rehabilitation Phase 2
Closes Oct 20, 3:00 pm (14 days)
Design and construction contract administration for Phase 2 rehabilitation of the Granville Bridge south ramps, City of Vancouver
Ministry of Environment and Parks
Porpoise Bay Park - Washroom and Shower Building Universal Design Renovation
Closes Oct 30, 2:00 pm (24 days)
Universal design and accessibility renovation of the washroom and shower building at Porpoise Bay Park campground, including structural, mechanical and electrical works, Ministry of Environment and Parks

Other opportunities

Vancouver Coastal Health Authority
RFEI BOZ00864 Children and Women Campus Infrastructure Planning Study
Closes Oct 9, 3:00 pm (3 days)
Expressions of interest for engineering and advisory services on an energy infrastructure feasibility study for the Children's and Women's Health Centre campus (PHSA)
Fraser Health Authority
ITT D424-00 UBCH Koerner Roof Renewal
Closes Oct 16, 3:00 pm (10 days)
Roofing contractor tender for Phase 1 penthouse roof renewal at UBC Hospital's Koerner Pavilion, an occupied clinical facility
  • 8:00am each weekday

    The briefing arrives at the start of the workday, with only the postings that fit your profile.

  • 1email

    Your best matches lead, with other opportunities worth a look below. No portal searches.

  • 6portals

    BC Bid, CanadaBuys, CivicInfo BC, City of Vancouver, Alberta Purchasing Connection and MERX in one email.

Your dashboard

Every posting that fits your profile, in one place.

  • Dailyupdates

    New postings are added each weekday morning, alongside your briefing.

  • 800+buyers to follow

    Follow a buyer to see everything they post, match or not.

  • Excelexport

    Select postings and download them for your go or no-go meeting.

Join the pilot

Start the pilot